Skip to main content

ACCELERATED CRITICAL PATH INC

Summary

Road, Dirt, Excavation, Embankment, Drainage, Heavy, Civil, Site Work, Bridge, Highway, Street, Dam

Industry

Profile

Incorporate State: Texas | Since: | Main/Branch: Branch | Profile views: 4

Address

State: Texas | County: Collin | City: Mckinney | Address: 9324 LEESBURG CT | ZIP Code: 75071-7421 | Map URL: 9324 LEESBURG CT MCKINNEY TX 75071-7421

Description

Water and Sewer Line and Related Structures Construction

Establishments in this category are primarly engaged in the construction of water and sewer lines, mains, pumping stations, treatment plants, and storage tanks. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to water, sewer line, and related structures construction. All structures (including buildings) that are integral parts of water and sewer networks (e.g., storage tanks, pumping stations, water treatment plants, and sewage treatment plants) are included in this industry.

Illustrative Examples:

Distribution line, sewer and water, construction
Sewer main, pipe and connection, construction
Fire hydrant installation
Storm sewer construction
Irrigation systems construction
Water main and line construction
Sewage disposal plant construction
Water treatment plant construction
Pumping station, water and sewage system, construction
Water system storage tank and tower construction
Reservoir construction
Water well drilling, digging, boring, or sinking (except water intake wells in oil and gas fields)

Highway, Street, and Bridge Construction

Establishments in this category are primarly engaged in the construction of highways (including elevated), streets, roads, airport runways, public sidewalks, or bridges. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to highway, street, and bridge construction (e.g., installing guardrails on highways).

Illustrative Examples:

Airport runway construction
Highway line painting
Causeway construction
Painting traffic lanes or parking lot lines
Culverts, highway, road, and street, construction
Pothole filling, highway, road, street, or bridge
Elevated highway construction
Resurfacing, highway, road, street, or bridge
Guardrail construction
Sign erection, highway, road, street, or bridge

Other Heavy and Civil Engineering Construction

Establishments in this category are primarly engaged in heavy and civil engineering construction projects (excluding highway, street, bridge, and distribution line construction). The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to heavy and civil engineering construction projects (excluding highway, street, bridge, distribution line, oil and gas structure, and utilities building and structure construction). Construction projects involving water resources (e.g., dredging and land drainage), development of marine facilities, and projects involving open space improvement (e.g., parks and trails) are included in this industry.

Illustrative Examples:

Channel construction
Land drainage contractors
Dam construction
Marine construction
Dock construction
Microtunneling contractors
Dredging (e.g., canal, channel, ditch, waterway)
Nuclear waste disposal site construction
Earth retention system construction
Flood control project construction
Park ground and recreational open space improvement construction
Railroad construction
Golf course construction
Subway construction
Horizontal drilling (e.g., cable, pipeline, sewer installation)
Trenching, underwater
Hydroelectric generating station construction
Tunnel construction

Contact

Similar Listings

Placeholder image
California Since: 2024
Los Angeles Branch
100 N CITRUS ST STE 600
West Covina

Browse by Industry