Summary

Drain Cleaning, Video Inspection, Dam

Description

Description

Beartooth's primary work focus is the Safety of Dams. We use high pressure and ultra high pressure water jetting to remove mineral buildup from pressure cells; foundation drains; monolith drains; turbine pit drains; piezometers; floor and roadway drains; spillway drains; form and face drains; and weep holes as they relate to dams. Upon request, we can provide before and after flows of individual drains; before and after video of individual drains; and a written report of our findings during the project. We have the experience, equipment, resources, ready-to-implement solutions for almost every challenge.

Special details

We use a variaty of rotating or fixed jetting tools operating at pressures ranging from 8000 psi to 20,000 psi.

Profile

  • Incorporated in
  • Established since
    2008
  • Main/Branch
    Branch

Address

Contact