Summary
Engineering Services | Other Management Consulting Services | Environmental Consulting Services | Other Scientific and Technical Consulting Services | All Other Professional, Scientific, and Technical Services
Description
Engineering Services
Establishments in this category are primarly engaged in applying physical laws and principles of engineering in the design, development, and utilization of machines, materials, instruments, structures, processes, and systems. The assignments undertaken by these establishments may involve any of the following activities: provision of advice, preparation of feasibility studies, preparation of preliminary and final plans and designs, provision of technical services during the construction or installation phase, inspection and evaluation of engineering projects, and related services.
Illustrative Examples:
Civil engineering services
Environmental engineering services
Construction engineering services
Mechanical engineering services
Engineers' offices
Robotics automation engineering services
Other Management Consulting Services
This includes establishments primarily engaged in providing management consulting services (except administrative and general management consulting; human resources consulting; marketing consulting; or process, physical distribution, and logistics consulting). Establishments providing telecommunications or utilities management consulting services are included in this industry.
Environmental Consulting Services
Establishments in this category are primarly engaged in providing advice and assistance to businesses and other organizations on environmental issues, such as the control of environmental contamination from pollutants, toxic substances, and hazardous materials. These establishments identify problems (e.g., inspect buildings for hazardous materials), measure and evaluate risks, and recommend solutions. They employ a multidisciplined staff of scientists, engineers, and other technicians with expertise in areas, such as air and water quality, asbestos contamination, remediation, ecological restoration, and environmental law. Establishments providing sanitation or site remediation consulting services are included in this industry.
Other Scientific and Technical Consulting Services
Establishments in this category are primarly engaged in providing advice and assistance to businesses and other organizations on scientific and technical issues (except environmental).
Illustrative Examples:
Agricultural consulting services
Motion picture consulting services
Biological consulting services
Physics consulting services
Chemical consulting services
Radio consulting services
Economic consulting services
Safety consulting services
Energy consulting services
Security consulting services
All Other Professional, Scientific, and Technical Services
Establishments in this category are primarly engaged in the provision of professional, scientific, or technical services (except legal services; accounting, tax preparation, bookkeeping, and related services; architectural, engineering, and related services; specialized design services; computer systems design and related services; management, scientific, and technical consulting services; scientific research and development services; advertising, public relations, and related services; market research and public opinion polling; photographic services; translation and interpretation services; and veterinary services).
Illustrative Examples:
Appraisal (except real estate) services
Marine surveyor (i.e., appraiser) services
Arbitration and conciliation services (except by lawyer, attorney, or paralegal offices)
Patent broker services (i.e., patent marketing services)
Commodity inspector services
Pipeline or power line inspection (i.e., visual) services
Consumer credit counseling services
Weather forecasting services
Handwriting analysis services
Profile
-
Incorporated in
-
Established since2016
-
Main/BranchBranch
Address
-
State
-
County
-
City
-
Address5870 FIELDSTONE DR
-
ZIP Code13035-9321
Contact
-
Phone
-
Email
-
Website
-
Contact PersonSara Martin